Team

The people in the meeting are the people doing the work

No account manager handing it to a subcontractor. This is the list, and it stays the same from start to finish.

C. W. Huang

Manager · Product strategy

Eight years as a product lead before moving to client work. Writes the problem as one sentence before anyone draws a screen.

Based inTaipei

Mika Aoyama

Design director

Six years of brand and design systems in Tokyo. Holds that a guideline nobody opens twice does not exist.

Based inTokyo

P. C. Chang

Engineering director

Distributed systems background. Makes sure every decision still has a stateable reason three years later.

Based inTaipei

Sofia Reyes

Engineer · Accessibility

Moves accessibility from the acceptance checklist into the design constraints. Tests with real users on every project.

Based inSingapore

Tell us what you are trying to solve

You will hear back within two working days, from the person who would do the work.

Start a project